CILS DMAIC Roadmap
A step-by-step guide for preparing ISO 13053-2:2011 compliant project story boards. All 28 DMAIC steps with the exact techniques mandated in the ISO standard (Factsheet references), key deliverables, and direct links to CILS Tools Hub.
Define Phase — Objectives
📋 Gate Review Checkpoints — ISO 13053-2:2011 §2.15
A Gate Review is a project review led by the sponsor each time a DMAIC stage is completed, in order to validate the conclusions of that stage. The project charter (Factsheet 07) is the primary gate review document.
ISO 13053-2:2011 Annex A — Factsheet Index (FS01 – FS31)
How to Use This Guide for ISO 13053-2:2011 Compliant Project Story Boards
What is a Story Board? A project story board is a visual summary of your DMAIC project. It must show the work done at each phase gate, the tools applied (referencing the ISO factsheets), and the results achieved.
Step 1 — Use the ISO technique tables: Each step above shows the exact techniques listed in ISO 13053-2 with their Factsheet numbers. Your story board must demonstrate that these techniques were applied at the appropriate steps.
Step 2 — For each step on your board: Show (a) the ISO technique used, (b) its Factsheet reference, (c) the output/result, and (d) how it led to the next step. Use screenshots or printouts from the CILS Tools Hub as evidence.
Step 3 — Factsheet compliance: Factsheets are informative (Annex A). Your story board should reference the Factsheet number beside each tool output, e.g. "Cause and Effect Diagram (FS12)" or "Control Chart (FS30)".
Step 4 — Gate reviews: At each phase boundary include a gate review summary — the sponsor-signed confirmation that the phase conclusions were validated before proceeding.
Step 5 — Financial evidence: Factsheets 01 and 20 (ROI and Indicators) are cited across multiple steps. Always include DPMO/Z-score at baseline (M6), the improvement delta (C4), and an ROI/net savings calculation (C5).