CILS Ford 8D Report Generator
1.Cover
2.Organization & Problem Background
3.D1 — 8D Team Charter
4.D0
5.D0 — Problem Symptoms & Customer Impact
6.D0 — Emergency Response Action (ERA)
7.D1
8.D1 — Team Roles & Responsibilities
9.D2
10.D2 — Problem Statement (5W2H)
11.D2 — Is / Is Not Analysis
12.D2 — Data Collection & Trend Analysis
13.D3
14.D3 — Interim Containment Actions (ICA)
15.D3 — ICA Effectiveness Verification
16.D4
17.D4 — Ishikawa / Fishbone Diagram
18.D4 — 5-Why Root Cause Analysis
19.D4 — Root Cause Verification
20.D5
21.D5 — Permanent Corrective Action (PCA) Options
22.D5 — Selected PCA & Proof of Fix
23.D6
24.D6 — PCA Implementation Plan
25.D6 — Validation Results & Before / After Comparison
26.D7
27.D7 — Systemic Prevention Actions
28.D7 — Updated Control Documents
29.D7 — Lessons Learned
30.D8
31.D8 — Team Recognition & Project Summary
32.8D Sign-off

Add Slide To

Ford 8 Disciplines Problem Solving Report
8D Problem Solving Report
Company / Supplier
—
Problem Reference No.
—
Report Date
DD/MM/YYYY
CILSFord 8D Report — Slide 1
1 / 32

Cover Slide

Ford 8 Disciplines Problem Solving Report
8D Problem Solving Report
Company / Supplier
—
Problem Reference No.
—
Report Date
DD/MM/YYYY
CILSFord 8D Report — Slide 1
Organization & Problem Background

Provide a brief description of the organization and the context in which this problem arose. Include relevant process or product background.

CILSFord 8D Report — Slide 2
D1Form the Team
D1 — 8D Team Charter
Champion: —
Team Leader: —
NameDepartment8D RoleE-mail
CILSFord 8D Report — Slide 3
D0
D0
Prepare for 8D
CILSSlide 4
D0Prepare for 8D
D0 — Problem Symptoms & Customer Impact

Describe the symptoms observed and reported by the customer. Include customer name, affected part/product number, quantity defective, and detection location.

CILSFord 8D Report — Slide 5
D0Prepare for 8D
D0 — Emergency Response Action (ERA)

Detail the immediate ERA implemented to protect the customer prior to D3 containment. State date implemented, responsible person, and verification method.

CILSFord 8D Report — Slide 6
D1
D1
Form the Team
CILSSlide 7
D1Form the Team
D1 — Team Roles & Responsibilities

Define each team member's specific 8D role. Include Champion (decision authority), Team Leader (process owner), SMEs (subject matter experts), and any supplier/customer representatives.

CILSFord 8D Report — Slide 8
D2
D2
Describe the Problem
CILSSlide 9
D2Describe the Problem
D2 — Problem Statement (5W2H)

Write a clear, specific problem statement using the 5W2H framework:

  • Who: Customer / End-user affected
  • What: What specifically failed or is wrong
  • When: When was the defect first detected
  • Where: Where in the process / product was the defect found
  • Why: Initial hypothesis (not root cause)
  • How: How was the defect detected
  • How Many: Quantity / rate of defect
CILSFord 8D Report — Slide 10
D2Describe the Problem
D2 — Is / Is Not Analysis

Use the Is/Is Not matrix to scope the problem accurately.

  • IS: State what the problem IS (object, defect, when, where, extent)
  • IS NOT: State what the problem IS NOT to eliminate irrelevant areas
  • Distinction: Highlight unique factors that separate IS from IS NOT
CILSFord 8D Report — Slide 11
D2Describe the Problem
D2 — Data Collection & Trend Analysis

Present defect trend data: time-series charts, Pareto charts, control charts, or customer complaint logs. Include baseline defect rate (PPM/DPMO) if available.

CILSFord 8D Report — Slide 12
D3
D3
Interim Containment
CILSSlide 13
D3Interim Containment
D3 — Interim Containment Actions (ICA)

List all ICAs implemented to prevent further defective product reaching the customer:

  • 100% inspection or sorting activities
  • Quarantine of suspect inventory
  • Temporary process holds or rework instructions
  • Responsible person and completion date for each action
CILSFord 8D Report — Slide 14
D3Interim Containment
D3 — ICA Effectiveness Verification

Provide evidence that ICAs are working effectively. Show before/after defect rates, customer feedback, escape data, or inspection results post-containment.

CILSFord 8D Report — Slide 15
D4
D4
Root Cause Analysis
CILSSlide 16
D4Root Cause Analysis
D4 — Ishikawa / Fishbone Diagram

Paste or insert the Cause & Effect (Fishbone/Ishikawa) diagram identifying potential root causes across the 6M categories: Man, Machine, Method, Material, Measurement, Mother Nature (Environment).

CILSFord 8D Report — Slide 17
D4Root Cause Analysis
D4 — 5-Why Root Cause Analysis

Document the 5-Why drill-down for the top potential causes. Separate analysis for:

  • Occurrence Root Cause: Why did the defect occur?
  • Escape Root Cause: Why was the defect not detected before reaching the customer?
CILSFord 8D Report — Slide 18
D4Root Cause Analysis
D4 — Root Cause Verification

Present statistical or experimental evidence confirming the root causes identified. Include correlation data, DOE results, hypothesis tests, or controlled trials that prove the cause-effect relationship.

CILSFord 8D Report — Slide 19
D5
D5
Permanent Corrective Actions
CILSSlide 20
D5Permanent Corrective Actions
D5 — Permanent Corrective Action (PCA) Options

List all candidate Permanent Corrective Actions evaluated. Use a decision matrix or Pugh concept selection comparing options against criteria: cost, effectiveness, feasibility, sustainability, time to implement.

CILSFord 8D Report — Slide 21
D5Permanent Corrective Actions
D5 — Selected PCA & Proof of Fix

State the selected PCA(s) and present proof of fix evidence — typically a controlled experiment showing the defect occurs when PCA is absent and does NOT occur when PCA is applied (turning on/off test).

CILSFord 8D Report — Slide 22
D6
D6
Implement & Validate PCAs
CILSSlide 23
D6Implement & Validate PCAs
D6 — PCA Implementation Plan

Present the full implementation plan (action register) including:

  • Each action item with owner and target date
  • Process changes, tooling modifications, procedure updates
  • Training requirements and sign-off plan
  • Removal of ICAs upon successful PCA validation
CILSFord 8D Report — Slide 24
D6Implement & Validate PCAs
D6 — Validation Results & Before / After Comparison

Show validation data confirming PCAs are effective in production. Include before/after control charts, capability indices (Cpk before vs after), defect rate comparison, and updated customer scorecard data.

CILSFord 8D Report — Slide 25
D7
D7
Prevent Recurrence
CILSSlide 26
D7Prevent Recurrence
D7 — Systemic Prevention Actions

Identify and implement systemic actions to prevent recurrence on similar products, processes, or production lines. Apply lessons learned across the broader manufacturing/service system.

CILSFord 8D Report — Slide 27
D7Prevent Recurrence
D7 — Updated Control Documents

List all updated control documents as a result of this 8D:

  • FMEA (Design or Process) — updated severity, occurrence, detection ratings
  • Control Plan — updated control methods and reaction plan
  • Standard Work / SOPs — updated work instructions
  • Engineering drawings / specifications (if applicable)
CILSFord 8D Report — Slide 28
D7Prevent Recurrence
D7 — Lessons Learned

Document key lessons learned from this 8D cycle to be shared across the organization and incorporated into future design/process reviews and new product introduction (NPI) checklists.

CILSFord 8D Report — Slide 29
D8
D8
Recognise & Close
CILSSlide 30
D8Recognise & Close
D8 — Team Recognition & Project Summary

Summarize the 8D outcomes: problem resolved, defect rate achieved, customer satisfaction restored. Recognize team contributions and provide summary of improvements delivered.

CILSFord 8D Report — Slide 31
D8Recognise & Close
8D Closure Sign-off

This is to certify that the Ford 8D Problem Solving Report for the referenced problem has been completed in full compliance with the 8-Disciplines methodology. All corrective actions have been implemented, validated, and systemic prevention measures are in place.

(Name)
Problem Champion
Date:
(Name)
Team Leader / Engineer
Date:
(Name)
Customer Representative
Date:
CILSFord 8D Report — Slide 32